Storage system located in the area:

  • District 7:
    • Warehouse nearby the Phu My Bridge: 5.000 m2, 3.500 m2.
  • Thu Duc district:
    • SOTRANS Thu Duc warehouse: 35.000 m2.
    • 60 tons electronic scale station in SOTRANS ICD.
  • Binh Chanh district:
    • SOTRANS Cho Dem warehouse: 15.000 m2.
  • Binh Duong:
    • Bonded warehouse and warehouse: (nearby Song Than industry zone) 9.000 m2, 13.000 m2.
  • Dong Nai:
    • SOTRANS Long Binh warehouse: 12.000 m2.
    • SOTRANS Nhon Trach warehouse: 70.000 m2.
  • Ba Ria – Vung Tau:
    • SOTRANS Phu My warehouse: 50.000 m2, launch in January 2017, with 80 tons electronic scale station. 2×3.000 m2, 3×2.000 m2, 1.700 m2, 1.000 m2.
  • Long An:
    • SOTRANS Long An warehouse: 9.000 m2.
  • Can Tho:  
    • SOTRANS Can Tho warehouse: 3.000 m2.
  • Ha Noi:
    • SOTRANS Ngoc Hoi warehouse: 8.500 m2.