Storage system located in the area:
District 7:
- Warehouse nearby the Phu My Bridge: 5.000 m2, 3.500 m2.
- Thu Duc district:
- SOTRANS Thu Duc warehouse: 35.000 m2.
- 60 tons electronic scale station in SOTRANS ICD.
- Binh Chanh district:
- SOTRANS Cho Dem warehouse: 15.000 m2.
- Binh Duong:
- Bonded warehouse and warehouse: (nearby Song Than industry zone) 9.000 m2, 13.000 m2.
- Dong Nai:
- SOTRANS Long Binh warehouse: 12.000 m2.
- SOTRANS Nhon Trach warehouse: 70.000 m2.
- Ba Ria – Vung Tau:
- SOTRANS Phu My warehouse: 50.000 m2, launch in January 2017, with 80 tons electronic scale station. 2×3.000 m2, 3×2.000 m2, 1.700 m2, 1.000 m2.
- Long An:
- SOTRANS Long An warehouse: 9.000 m2.
- Can Tho:
- SOTRANS Can Tho warehouse: 3.000 m2.
- Ha Noi:
- SOTRANS Ngoc Hoi warehouse: 8.500 m2.